The Development of 4D BIM Based Infrastructure Construction Time Planning Standard Operating Procedure to Enhance Communication Quality from Infrastructure Contractor Perspective

Almadani Jayadi, Leni Sagita Riantini

Abstract


4D BIM can be utilized as a visual communication media that simulates construction process, including infrastructure projects, to all stakeholders. One of its benefits is to enhance communication quality that can positively affect infrastructure construction time planning phase, which was one of the most important aspect in contractor’s business process. This research used qualitative method through interviews and expert validation to identify main activities in construction time planning phase, 4D BIM role in those activities, and involved stakeholders. As a result, 4D BIM based construction time planning strategy in the form of standard operating procedure and communication flow was developed to be used as guideline references for BIM implementation in Indonesia.

Full Text:

PDF


DOI: https://doi.org/10.32535/jicp.v2i1.393

Refbacks

  • There are currently no refbacks.


Copyright (c) 2021 Almadani Jayadi, Leni Sagita Riantini

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

Flag Counter

Published by:

AIBPM Publisher

Editorial Office:

JL. Kahuripan No. 9 Hotel Sahid Montana, Malang, Indonesia
Phone:
+62 341 366222
Email: journal.jicp@gmail.com
Website:http://ejournal.aibpmjournals.com/index.php/JICP

Supported by: Association of International Business & Professional Management

If you are interested to get the journal subscription you can contact us at admin@aibpm.org.

ISSN 2622-0989 (Print)
ISSN 2621-993X (Online)

DOI:Prefix 10.32535 by CrossREF

Journal of International Conference Proceedings (JICP) INDEXED:

 

In Process


This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.