Administration and Claims Documentation System for Non Integrated Joint Venture Contract
Abstract
The development of technology in modern times requires contractors especially in Indonesia to compete and adjust their capabilities with foreign contractors whose technology has been developed rapidly. One of the efforts is to establish a joint venture company. Construction project has various risk that influence the relationship between the engaging party and might trigger conflict. In order to avoid it, it is necessary to develop administrative and claim documentation system. A case study is used to obtain this research aim and analyze factors that dominate the project claims. Therefore, unavoidable risk can be managed in this type of contract.
Full Text:
PDFDOI: https://doi.org/10.32535/jicp.v2i1.463
Refbacks
- There are currently no refbacks.
Copyright (c) 2021 Muhammad Multazam, Ayomi Dita Rarasati

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Published by:
AIBPM Publisher
Editorial Office:
JL. Kahuripan No. 9 Hotel Sahid Montana, Malang, Indonesia
Phone:+62 341 366222
Email: journal.jicp@gmail.com
Website:http://ejournal.aibpmjournals.com/index.php/JICP
Supported by: Association of International Business & Professional Management
If you are interested to get the journal subscription you can contact us at admin@aibpm.org.
ISSN 2622-0989 (Print)
ISSN 2621-993X (Online)
DOI:Prefix 10.32535 by CrossREF
Journal of International Conference Proceedings (JICP) INDEXED:
In Process
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.