Development of Business Process Based on Risk in Procurement Process of High-Rise Vertical Housing to Improve Performance Time in The Ministry of Public Works and Housing
Abstract
Full Text:
PDFReferences
Anggita. T. (2020). Public housing urban vertical housing affordable living solutions in the city center for Indonesian people in the future. NAWASIS. http://nawasis.org/portal/berita/read/public-housing-rumah-susun-perkotaan-solusi-hidup-terjangkau-di-tengah-kota-bagi-masyarakat-indonesia-di-masa-depan/51949
Desiyandri, A. (2016). Evaluation of the risk-based bridge construction process quality management system in the bridge directorate of the ministry of public works and housing [Doctoral Dissertation]. Depok: University of Indonesia.
Directorate General of Housing. (2020). Dynamics of large-scale housing. Ministry of Public Works and Housing.
Housing Development Work Unit. (2020). Housing Development Work Unit Report 2016 – 2020. Ministry of Public Works and Housing.
Indarwati, L., & Latief, Y. (2019). Time acceleration of understructure works with fast-track method zoning-based (Case Study: Transit Oriented Development Light Rail Transit Jakarta Phase I Project). Journal of International Conference Proceedings (JICP), 2(1), DOI: https://doi.org/10.32535/jicp.v2i1.455.
Kumaraswamy, M. M. & Chan, D.W.M. (1998). Contributors to construction delays. Journal Construction Management and Economics, 16, 17-29.
Love, P. E. D. (2002). Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management,128(1), 18-29.
Ministerial of Public Works and Housing Regulation Number 1/2018, Concerning vertical housing building and management help.
Ministerial of Public Works and Housing Regulation Number 14/2020, Concerning standards and guidelines for procurement of construction services through providers.
Ministerial of Public Works Regulations Number 05/2007, Concerning technical guidelines for the construction.
Ministry of Communication and Informatics. (2016, October 18). Adequate residential for audience. Kominfo. https://www.kominfo.go.id/content/detail/8239/hunian-layak-untuk-khalayak/0/kerja_nyata
Ministry of National Planning. (2017). part-time evaluation national mid-term development plan 2015- Concerning 2019.
Ministry of National Planning. (2020). Concerning National mid-term development plan 2020-2024.
Okifitriana, M. (2020). Development of a quality management system for the procurement of construction services to improve the quality of contractors’ performance at the university of Indonesia [Doctoral Dissertation]. Depok: University of Indonesia.
Oktaviani, C. Z. (2015, May 19). Study of the effect of construction work procurement performance on construction project performance. Proceeding of National Seminar on Civil Engineering V. Surakarta: University of Muhammadiyah Surakarta.
Palaneeswaran. E. (2006, May 12). Reducing rework to enhance project performance levels. Proceedings of the One-day Seminar on “Recent Developments in Project Management in Hong Kongâ€. Hong Kong: Research Gate.
Prameiswari, A. K. (2014). Identification of risk factors in the material procurement process in EPC projects that affect time and cost performance [Doctoral Dissertation]. Depok: University of Indonesia.
Prayitno, G. A. & Kindangen, J. I. (2019). Evaluation of the distribution of housing areas based on spatial patterns in Palu city. Journal of Urban and Regional Planning, 6(1), 321-330.
Presidential Regulation Number 16/2018, Concerning government procurement of goods/services.
Suryani, R., & Riantini, L. S. (2019). The development of Green BIM based standard operating procedure on schematic design phase of building projects to improve duration performance from the perspective of architecture consultant. Journal of International Conference Proceedings (JICP), 2(1), DOI: https://doi.org/10.32535/jicp.v2i1.482
Susanto, H. & Makmur, H. (2013). Auditing construction projects. Yogyakarta: Andi Offset.
Suwandari, Y. D., & Riantini, L. S. (2019). Development of operational standards for risk-based cultural heritage office building maintenance procedures that the building safe and comfortable to use (Study case heritage office building PT.X). Journal of International Conference Proceedings (JICP), 2(1), DOI: https://doi.org/10.32535/jicp.v2i1.505
Tan, W. (2011). Practical research methods. Singapore: Pearson Custom.
The Law of the Republic of Indonesia Number 20/2011, Concerning vertical housing.
Wijayanti, L. I. (2016). Evaluation of the procurement process of construction service providers in the risk-based building renovation project at Bank X with the PLS SEM method to improve procurement performance [Thesis]. Depok: University of Indonesia.
Wiyana, Y. E. (2012). Construction and building failure analysis from the perspective of technical factors. Journal of Civil Engineering Forum, 17(2), 77-86.
DOI: https://doi.org/10.32535/jicp.v4i1.1153
Refbacks
- There are currently no refbacks.
Copyright (c) 2021 Marendi Rahman, Muhammed Ali Berawi

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Published by:
AIBPM Publisher
Editorial Office:
JL. Kahuripan No. 9 Hotel Sahid Montana, Malang, Indonesia
Phone:+62 341 366222
Email: journal.jicp@gmail.com
Website:http://ejournal.aibpmjournals.com/index.php/JICP
Supported by: Association of International Business & Professional Management
If you are interested to get the journal subscription you can contact us at admin@aibpm.org.
ISSN 2622-0989 (Print)
ISSN 2621-993X (Online)
DOI:Prefix 10.32535 by CrossREF
Journal of International Conference Proceedings (JICP) INDEXED:
In Process
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.