Evaluation of Building Safety System Aspect Based on Risk (Case Study Building Heritage in Jakarta)
Abstract
Full Text:
PDFReferences
Akasah, Z. (2010). Maintenance management process model for school buildings: An application of idef0 modeling methodology. Australian Journal of Civil Engineering, 8(1), 1–13.
Akasah, Z. A., Abdul, R. M. A., & Zuraidi, S. N. F. (2011). Maintenance management success factors for heritage building: A framework. WIT Transactions on the Built Environment, 118(May), 653–658.
Amin, M., Alisjahbana, S. W., & Simanjuntak, M. R. (2018). Analysis model of master plan fire protection system in building and environment in DKI Jakarta - Indonesia. International Journal of Civil Engineering and Technology, 9(11), 60–69.
Andayani, K., & Subangi, L. (2020). Tingkat kesiapan gedung cagar budaya filately dalam menghadapi bahaya kebakaran. Akselerasi, 2(1), 145–152.
Baharuddin, M. N., Bahardin, N. F., Rashid, R. A., Hashim, H., & Ali, I. M. (2014). Analysis of critical factors and difficulties in maintaining historical building - A current implementation. MATEC Web of Conferences, 15, 1–11.
Druķis, P., Gaile, L., & Pakrastiņš, L. (2017). Inspection of public buildings based on risk assessment. Procedia Engineering, 172, 247–255.
Handayani, A. (2019). Socialization of fire mitigation in densely populated area at Jati Sampurna, Bekasi. ICCD, 2(1), 616–617.
Idrus, A., Khamidi, F., & Sodangi, M. (2010). Maintenance management framework for conservation of heritage buildings in Malaysia. Modern Applied Science, 4(11), 66-77.
Law No. 11/2010 on Cultural Heritage
Ministerial Regulation of Public Works and Housing Minister of the Republic of Indonesia number 01/PRT/M/2015
Peters, M., & Pikkemaat, B. (2006). Innovation in tourism. Journal of Quality Assurance in Hospitality & Tourism, 6(3-4), 1-6.
PMBOK (2013). A guide to the project management body of knowledge. Retrieved from https://www.pmi.org/-/media/pmi/documents/public/pdf/pmbok-standards/pmbok-guide-5th-errata.pdf
Roslan, R., & Said, S. Y. (2017). Fire safety management system for heritage buildings in Malaysia. Environment-Behaviour Proceedings Journal, 2(6), 221-226.
Sodangi, M., Khamidi, M. F., & Idrus, A. (2013). Towards sustainable heritage building conservation in Malaysia. Elsevier, 1(1), 54–61.
Sugihartoyo, S., & Widagdo, W. (2010). Strategi Pengembangan Wisata Kota Tua Sebagai Salah Satu Upaya Pelestarian Urban Heritage (Studi Kasus : Koridor Kali Besar, Jakarta Barat). Planesa, 1(1).
Suwandari, Y. D., Amin, M., & Primatama, M. A. (2020). Risk Analysis of Heritage Building in Jakarta. International Journal of Applied Business and International Management, 5(2), 91–97.
Wardani, A. A. A. M. C., Thanaya, I. N. A., Astana, N. Y., & Yana, A. A. G. A. (2019). Production stage and risk identification on asphalt mixing plant in Bali. International Journal of Applied Business and International Management, 4(3), 1–14.
DOI: https://doi.org/10.32535/apjme.v4i1.1038
Refbacks
- There are currently no refbacks.
Copyright (c) 2021 Yunita Dian Suwandari, Mawardi Amin, Muhammad Agus Primatama

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Asia Pacific Journal of Management and Education (APJME)
ISSN 2655-2035 (Online)
DOI Prefix: 10.32535 by CrossRef
Published by AIBPM Publisher
JL. Kahuripan No. 9, Hotel Sahid Montana, Malang, Indonesia
Email: editor.apjme@aibpm.org
Phone: +62 341 366222
Website: https://aibpmpublisher.com/
Governed by
Association of International Business and Professional Management
Email: admin@aibpm.org
Website: https://www.aibpm.org/
Licensing Information
Asia Pacific Journal of Management and Education (APJME) is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License .