Identification of Project Construction Delay Factors in Depok City, West Java (Study in Department of Housing and Settlement, Depok City)

Ama Muttahizi Ahadan Auhan, Ayomi Dita Rarasati

Abstract


Depok is one of the big cities in West Java, and it is a buffer zone for the capital city of Indonesia, Jakarta. Hence, the Depok city government is very active in developing the city, especially in building housing and settlements. There are many projects handled by the government but are often delayed. To solve these problems, the purpose of this research is to identify the construction project delay factor. There are 5 variables studied in this study such as project owner factors, contractor factors, consultant factors, shared responsibility factors, and external factors. This research is research with a qualitative approach by conducting a literature review and the results will be validated by experts following the provisions of the Project Management Institute. The results of the analysis show that 5 variables, namely project owner factors, contractor factors, consultant factors, shared responsibility factors and external factors are very valid in influencing construction project delays in Depok City. This research is expected to have positive implications and become a reference in mitigating the risk of delays by determining the control measures for future projects in Depok City and other cities.

 

Keywords: Delay, Delay Factor, Construction, Housing Project, Depok

Keywords


Delay, Delay Factor, Construction, Housing Project, Depok

Full Text:

PDF

References


Agyekum-Mensah, G., & Knight, A. D. (2017). The professionals’ perspective on the causes of project delay in the construction industry. Engineering, Construction and Architectural Management, 24(5), 828–841.

Asmi, A., Djamaris, A., dan Ihsan, M. (2019). Top Ten Similarity Ranking for Project Delay Factors in Construction Industry. IOP Conference Series: Materials Science and Engineering, 650, 012006. doi:10.1088/1757-899x/650/1/012006

Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357.

Choong Kog, Y. (2018). Major Construction Delay Factors in Portugal, the UK, and the US. Practice Periodical on Structural Design and Construction, 23(4), 04018024. doi:10.1061/(asce)sc.1943-5576.0000389

Creswell, John W. (2018). Research Design: Pendekatan Kualitatif, Kuantitatif, dan Mixed.Edisi Keempat. (terj). Pustaka Pelajar: Yogyakarta

Elhusseiny, H. O., Nosair, I., & Ezeldin, A. S. (2021). Systematic processing framework for analyzing the factors of construction projects’ delays in Egypt. Ain Shams Engineering Journal, 12(2), 1501–1511.

Kurniawan, I, Saputra, P. D., Safri, and Saputro, R. (2021) Development of Delay Factor Model for Substructure Works in Building Construction. Advances in Engineering Research, 203, 259-264.

Latief, I. Q. Bux, Al Saadi, A. M. D. & Rahman, I. A. (2019) Identification of Delay Factor in Oman Construction Industry, International Journal of Sustainable Construction Engineering and Technology, Vol. 10 No. 1, 34-45

PMI. (2017). Project Management Body of Knowledge. Project Management Institut, Inc.: Pennsylvania

Ramli, M. Z., Malek, M A., Hanipah, M. H., Lin, C. L., Sukri, M. F. M., Zawawi, M. H., Abidin, M. Z. Z., Fuad, N. F. S. M. (2017) Study of factors influencing construction delays at rural area in Malaysiaâ€, International Post Graduate Conference on Applied Science & Physics 2017, IOP Conf. Series: Journal of Physics: Conf. Series 1049, 012017

Ramli, M. Z., Malek, M. A., Hamid, B., Roslin, N. T., Roslan, M. E. M., Norhisham, S. and Mohd, M. F. (2018) Influence of Project Type, Location and Area towards Construction Delay: a Review on Significance Level of Delay Factors. International Journal of Engineering & Technology, 7,4.35, 392-399.

Sugiyono. (2018). Metode Penelitian Kuantitatif. Bandung: Alfabeta

Susanti, R., Fauziyah, S., & Suwarto, F. (2021). Assessing Factors Towards Construction Project Delays, IOP Conf. Ser.: Earth Environ. Sci. 700 012064

Tahmasebinia, F., Song, V. (2022). Significant Factors Causing Delay in the Cambodian Construction Industry. Sustainability, 14, 3521.

Wuala, H. D., & Rarasati, A. D. (2020). Causes of delays in the construction project for developing Southeast Asia countries. IOP Conference Series: Materials Science and Engineering, 830, 022054. doi:10.1088/1757-899x/830/2/022054

Zidane, Y. J.-T., & Andersen, B. (2018). The top 10 universal delay factors in construction projects. International Journal of Managing Projects in Business, 11(3), 650–672.




DOI: https://doi.org/10.32535/ijabim.v7i3.1959

Refbacks

  • There are currently no refbacks.




Copyright (c) 2022 Ama Muttahizi Ahadan Auhan, Ayomi Dita Rarasati

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

International Journal of Applied Business and International Management (IJABIM)

ISSN 2614-7432 (Print) | ISSN 2621-2862 (Online)

DOI Prefix: 10.32535 by CrossRef

Published by AIBPM Publisher

JL. Kahuripan No. 9, Hotel Sahid Montana, Malang, Indonesia

Email: journal.ijabim@gmail.com

Phone: +62 341 366222

Website: https://aibpmpublisher.com/

Governed by

Association of International Business and Professional Management

Email: admin@aibpm.org

Website: https://www.aibpm.org/

Indexed by

SINTA Garuda Google Scholar Dimensions ASEAN Citation Index

Visitor Statistics

Flag Counter

Web Analytics

View IJABIM Stats

Follow Us: